Next Prev

BGCJWSA Water Treatment Plant

Location: Glynn County, GA

Client: Glynn County

Project Scope:

  • Wet Well Design
  • Elevated Water Storage Tank Design and Sizing
  • Permitting
  • Bid Phase Services
  • Construction Observation

Project Description:

Thomas & Hutton was hired by Glynn County to perform engineering and design services for a new water treatment plant.

Thomas & Hutton designed a standard small water treatment plant with two HSP, one well, and three chemical pumps. Device controllers with automatic algorithms maintain the basic and operational criteria, including Run Status, Open/Close, Stop/Start, etc. Additionally, grouped device controllers with automatic algorithms control primary and secondary devices, position of certain devices, and assign devices to different tasks.

Thomas & Hutton’s responsibilities included permitting, surveying, designing, and construction observation of the HSP, well, chemical pumps and all of the appurtenances and incidentals required for the new water treatment plant.

BGCJWSA Water Treatment Plant