Bishop England High School

Location: Daniel Island, SC

Client: The Catholic Diocese of Charleston, SC

Project Scope:

  • Land Planning
  • Surveying
  • Civil Site Design
  • Permitting Assistance
  • Construction Observation
  • Project Closeout

Project Description:

Thomas & Hutton provided land planning, surveying, civil site design, permitting assistance, and construction monitoring for a 400-acre high school site. In addition to a new 120,000-square foot building, the project included a practice field, baseball field, football facility, track, tennis courts, over 300 parking spaces, driveways, and the necessary infrastructure to serve the new facility.

Thomas & Hutton performed a drainage study that incorporated the school into the broader Daniel Island storm drainage system.

Founded in 1915, Bishop England is the largest diocesan Catholic 4-year high school in South Carolina.

Bishop England High School