Habour Town Marina

Location: Hilton Head, SC

Client: Sea Pines Company

Project Scope:

  • Marina Design
  • Dredging
  • Permitting
  • Planning

Project Description:

Thomas & Hutton was responsible for the original marina design including floating docks, dredging, and bulkhead. In 1998 modifications of concrete sheet pile bulkhead, installation of breakwaters and additional piers, the removal and replacement of concrete floating docks, power centers, water lines and piling was performed. Also included was the dredging of the marina and the addition of a wave and sedimentation barrier wall with the timeber boardwalk.