Project Kickoff: Rail Trail Bridge in Charlotte, NC

Project Kickoff: Rail Trail Bridge in Charlotte, NC

We’re thrilled to see the kickoff of the Rail Trail Bridge Project in Charlotte, NC, a signature pedestrian and bicycle bridge that will span I-277 and connect Uptown and South End via the existing rail trail.

With a $16.4 million investment and a design team including schlaich bergermann partner sbp, Thomas & Hutton (T&H), and Depeña Studios, this project brings multimodal connectivity, architectural flair, and elevated walkability to the heart of the city.

At T&H we believe strong infrastructure links more than locations; it links people, neighborhoods, and possibilities. We look forward to playing our part in delivering a project that helps build a future ready Charlotte where movement is safe, accessible, and inspiring for all.

Learn more about the Rail Trail Bridge here: https://lnkd.in/eqC9fr7t

Blythe Construction, Inc.