Thomas & Hutton provided engineering design, permitting, and construction services for the 1.1 million square foot TBC distribution center located within the Rockefeller Group Foreign Trade Zone development. Due to the time sensitive nature of this project, Thomas & Hutton designed the 124-acre site, along with approximately 3,330 linear feet of public road and water and sewer systems within three weeks and received all permits within two months. In addition to meeting these goals, Thomas & Hutton was also asked to assist in submitting for LEED certification for this building. As part of the construction process, large amounts of unsuitable soil were encountered that required close coordination with the geotechnical engineer and site work contractor. The team was able to work together to come up with creative solutions, which kept the project on schedule.